HICC Construction Pictures

HICC Phase 2- Civil Work

Last updated: April 2021

– RTU( Heating and cooling system) has been installed 

–  Windows and doors has been installed

– Pot light and lights fixtures have been installed

– Washroom and wadu area tiles have been installed

– Millwork in the main hall has been completed

[ngg src=”galleries” ids=”25″ display=”basic_slideshow”]Last updated: Feb 2021

– Railing has been installed

-Drywall in the basement and the main floor has been installed

[ngg src=”galleries” ids=”24″ display=”basic_slideshow”] 

Last updated: Dec 2020

– Electrical, HVAC, Fire Alarm, Plumbing inspection passed

[ngg src=”galleries” ids=”23″ display=”basic_thumbnail” thumbnail_crop=”0″]Last updated: Oct 2020

-Sprinkle installed by volunteers

-SOD installed by volunteers

[ngg src=”galleries” ids=”22″ display=”basic_thumbnail” thumbnail_crop=”0″]Last updated: July 15, 2020

-fire fighting tank Installation

[ngg src=”galleries” ids=”20″ display=”basic_thumbnail” thumbnail_crop=”0″]Last updated: Feb 21, 2020

[ngg src=”galleries” ids=”19″ display=”basic_thumbnail” thumbnail_crop=”0″]

  • Extension of building framing 
  • Weeping tiles installation work in the basement 
  • Basement floor 

Last updated: Feb 02, 2020

[ngg src=”galleries” ids=”18″ display=”basic_slideshow”]January 2020

[ngg src=”galleries” ids=”16″ display=”basic_thumbnail” thumbnail_crop=”0″]

  • Frame work has been started in main hall and sisters area

Updated December 2019

[ngg src=”galleries” ids=”15″ display=”basic_thumbnail” thumbnail_crop=”0″]

  • Ramp and main entrance

Updated December 2019

[ngg src=”galleries” ids=”14″ display=”basic_thumbnail” thumbnail_crop=”0″]

  • Front Extension of Masjid
  • Concrete entrance from front 

Updated December 2019

[ngg src=”galleries” ids=”13″ display=”basic_thumbnail” thumbnail_crop=”0″]

  • Extra Porous Parking work started Nov 2019 and completed Dec 2019

Updated: Dec 07

[ngg src=”galleries” ids=”11″ display=”basic_thumbnail” thumbnail_crop=”0″]

  • Landscaping work

Updated: Nov 29

[ngg src=”galleries” ids=”10″ display=”basic_thumbnail”]

  • First layer of Asphalt

Updated: Oct 08

[ngg src=”galleries” ids=”9″ display=”basic_thumbnail”]


  • CONCRETE SIDEWALK AND PARKING LOT

Updated: Oct 27,

[ngg src=”galleries” ids=”8″ display=”basic_thumbnail”]


  • ROADWAY ENTRANCE PREP WORK
         PREPARE AREA TO BACK FILL ROADWAY ENTRANCE TO PARKING AS REQUIRED ON GRADING PLAN IN PART B
         COMPACT AREA AFTER BACKFILLING AS REQUIRED TO GET APPROVED COMPACTION TEST.
          SPREAD 150 MM OF GRANULAR A AND 250MM GRANUALR B
          COMPACT IN LAYERS USING HEAVY MACHINERY AND VIBRATORY ROLLERS

Updated: Oct 18

[ngg_images source=”galleries” container_ids=”7″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”1″ slideshow_link_text=”[Show slideshow]” template=”/homepages/15/d312463159/htdocs/app312463168/wp-content/plugins/nextgen-gallery/products/photocrati_nextgen/modules/ngglegacy/view/gallery-caption.php” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]


  • STARTED EXCAVATING PARKING AND DRIVEWAY
    • OUTLINE AND PREPARE TO EXCAVATE NEW DRIVEWAY AREA AND PARKING LOT
    • EXCAVATE AND DIG DOWN AREA OUTLINED AS PER GRADING PLAN

Updated: Oct 11

[ngg_images source=”galleries” container_ids=”5,6″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”1″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]


  • CULVERT PIPE INSTALLATION
    • EXCAVATED AREA AS REQUIRED TO INSTALL CULVERT PIPE
    • PREPARE AREA TO INSTALL CULVERT PIPE AS PER GRADING PLAN

Updated : Sep 29

[ngg_images source=”galleries” container_ids=”3″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”1″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]


  • First day of construction pictures

Updated : Sep 24


  • Site Permits received
  • Construction equipments in place

Updated : Sep 22

[ngg_images source=”galleries” container_ids=”1″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”1″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]


  • Mud Mat
  • Straw bale flow check dams
  • Riverstone check dams

Last updated : July 2019

[ngg_images source=”galleries” container_ids=”2″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”1″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]